Message Bar
Close Message Bar

B&L Receives Best Firms to Work For Award

For the seventh consecutive year by Zweig Group Read More

Menu

Rehabilitation of Halls Hill Road

What was the Challenge?

This project consisted of milling and paving almost 4,000 linear feet of roadway, including striping two travel lanes with pavement marking for bicycles and modifying existing sidewalks.

How did Barton & Loguidice provide a solution?

B&L completed the design, permitting and construction administration of the project for the Town of Colchester. Existing sidewalks were modified to include ADA compliant ramps and approximately 2,000 linear feet of new sidewalk was installed on the south side of the road. We also installed Rectangular Rapid Flashing Beacon systems at two mid-block crosswalks on Halls Hill Road that serves two schools.

Why was the project a success?

We were able to upgrade both the roadways and sidewalks while increasing safer usage for bicyclists and students. This nearly $800,000 project was funded under the Local Transportation Capital Improvement Project (LOTCIP) through the CT Department of Transportation. The Southeastern Connecticut Council of Government (SCCOG) administered the LOTCIP grant.

Project At a Glance

Location

Connecticut

Services

  • Funding First
  • Highway Engineering
  • Traffic Planning & Engineering
  • Trails & Greenways

Related Articles

Insight

February 23, 2024

Professional Consultant Selection – Navigating the Process

Read Article

At Barton & Loguidice we’re passionate about our clients, our work, and making a positive impact on the world around us. Learn more about our mission and culture.

Firm Overview