Menu

Pratt & Whitney HMI Plant Capacity Expansion

What was the Challenge?

Pratt & Whitney HMI’s plant in Clayville, New York was seeking to grow and expand its facility. It was necessary to ensure that with its expansion, the facility would be able to control the consistency of water temperature within its process cooling system.

How did Barton & Loguidice provide a solution?

B&L was in charge of the civil, structural, mechanical, plumbing, electrical, and architectural engineering services for this project. The engineering services included the design for a new process cooling system. The new process cooling system includes a hybrid closed-circuit fluid cooler for cool weather operation as well as air-cooled chillers for warm weather operation. The new system also provides heat rejection to the atmosphere through various pieces of equipment, resulting in system redundancy and reduced energy consumption.

Why was the project a success?

The project has contributed to an increase in production capacity for Pratt & Whitney HMI.

Project At a Glance

Location

New York

Services

  • Construction Services
  • Electrical Engineering
  • Industrial Services
  • Mechanical Engineering
  • Structural Engineering

Related Articles

Insight

September 23, 2020

New York Municipalities Will Be Impacted by Proposed Regulatory Framework

Read Article

At Barton & Loguidice we’re passionate about our clients, our work, and making a positive impact on the world around us. Learn more about our mission and culture.

Firm Overview