 Q1: Why is the Town holding a vote for water district formation? |
A: Holding a public vote is the surest way for the Town Board to know the majority of the affected public is in favor of the project. |
 Q2: Who is eligible to vote? |
A: Refer to the Rules of Voting document prepared by the Town Attorney (to the left) for information on voting eligibility. |
 Q3: I own a single-family house. How much will I pay per year? |
A: The Town has received notice that the project qualifies for a 30-year loan at 1% interest through the Drinking Water State Revolving Fund (DWSRF). The estimated total cost for a typical single-family household is $591 per year.
The anticipated rate schedule is as follows: Amount on January taxes: $486 Sandy Creek Operation and Maintenance: $25 Water Charge ($40 semi-annually for first 40,000 gallons used): $80 Total for typical household: $591 |
 Q4: I own a vacant parcel. How much will I pay per year? |
A: Vacant parcels will be charged as half of a single-family household. Therefore, vacant parcel owners will pay an estimated $243 per year. Property owners will be charged per parcel. If a property owner owns both a developed and a vacant parcel, they will be charged for each parcel separately, similar to other property taxes. |
 Q5: I own two adjacent parcels. What if I merge these parcels into one parcel? |
A: Parcels that are merged will be charged as a single parcel. If a parcel containing a single-family household is merged with an adjacent vacant parcel, the parcel will then be charged as a single-family parcel in the following year. |
 Q6: I own a land-locked parcel. How much will I pay per year? |
A: Land-locked, un-served parcels, including un-served parcels in additional sections, will be assessed as 0.1 units, or approximately $48.60 per year. |
 Q7: How much will it cost me to connect to the water main? |
A: Property owners will be required to pay for facilities located on private property. These facilities include copper pipe from the curb box (located at the right-of-way boundary) to the house ($15 - $25 per foot), a meter pit of the house is more than 150 feet from the right-of-way boundary ($520), a water meter ($160), a pressure reducing valve if necessary ($60), a water service inspection ($125), and any changes to plumbing required within the house. Note that these costs are based on current quotes from suppliers and may vary at the time of connection.
Property owners will also be required to disconnect from their private well or other water source per County Health Code.
|
 Q8: If a parcel of property has two or more individual camps or trailers on it, why would there only be one water meter? And along with that question is the question of trailer parks……is one trailer park going to have only one meter since it is one parcel and then multiple trailers are put on one meter. Not allowed in Onondaga County…..why would it be allowed in Oswego County….each individual camp/house, trailer or apartment was mandated to be on an individual line in new water districts in Onondaga County |
A: If you own a trailer park, you would have a single larger meter. If you fail to pay the water bill, the Town has the ability to put un-paid bills on your property tax bill. The Town has no means of recovering money from your tenants. You would be responsible for water billing to individual tenants. You can sub-meter if you wish. |
 Q9: What if one owner has two or more adjacent pieces of property on the tax rolls; would there be a unit charge for each parcel? |
A: Yes. Please note that you can choose to merge these parcels into one.
|
 Q10: Please explain breakdown of loan per unit and what is the interest rate and is it a loan or a bond? And what other costs are included in the per year cost? |
A: The estimated cost per unit to repay the loan taken for capital costs is approximately $486 per year. The Town has received notice that the project qualifies for a 30-year loan at 1% interest. |
 Q11: Will main water lines go down the center of the roads as was indicated to us at meeting….or on the side of roads….and what if the private roads in the district are very winding…….and what if trees need to be cut down and how close to buildings can the water line be? |
A: Generally, the water line will go down the middle of the road. Ideally, we like to be at least 10 feet from buildings. We can usually spare trees by using trenchless pipe installation methods. This area is very typical of many of our recent waterline projects.
|
 Q12: As for the fire hydrants….what are the requirements for distance set apart and will there be some consideration in not having them set in the middle of a parcel but instead at the edge or between two parcels? |
A: In populated areas, hydrants are spaced at about 600 feet. We generally place hydrants near property edge. We will stake locations in advance to avoid taking up your favorite car/RV/trailer parking/turn-around spot.
|
 Q13: And who maintains the water line and fire hydrants throughout the year, mostly in the winter especially on private roads? |
A: Town water district personnel. |
 Q14: Questions have been asked about getting approval from residents on private roads for access…..what if someone refuses? What if several residents in a row refuse? What is the process to get approval? |
A: Based on our experience with similar lake front water projects with many private roads, 99+% of the easements are obtained voluntarily. The Town would use their power of eminent domain to obtain any necessary outstanding easements.
|
 Q15: Is the water district now set in stone or if areas in the “proposed” water district want to be deleted and other areas added, how is that done and when is there a cut off? Would it be set once all the petitions were completed? |
A: The Map, Plan and Report has been finalized and the “proposed” boundary is now official. Some small changes were made to the boundary since the petition circulated last year due to strong public opinion. The boundary is referred to as “proposed” because the water district has not yet been formed. |
 Q16: And, if a parcel is subdivided later, say into a housing development, would the whole housing development remain as one unit or how would that be calculated? |
A: Each subdivided parcel would be subject to the terms of the district. Each parcel in the sub-division would get its own charge. |
 Q17: And would the town recalculate the units to be charged for the loan each year to reflect any changes? To reflect vacant lots being built on, subdivisions, two parcels combined into one, etc. |
A: Unit charges would be reviewed and adjusted by the Town board annually. |
 Q18: Would businesses be charged as a multi unit rate, and, if so, what and if not, why not? |
A: Charges would be assessed on an equivalent dwelling unit basis (EDU) with one (1) EDU being a typical single-family house. A business that has the potential to use twice as much water as a typical single-family house would be assessed two (2) EDUs. |
 Q19: What are the approved installation requirements? Copper vs. plastic pipe, pressure reducers, meter pits (who needs them and is it figured because of house/camp distance from road or seasonal or not or ???), licensed plumber, shut off valves, size of water pipe into house/camp, etc. |
A: The Town will develop and issue standards when the time comes. |
 Q20: Question was asked if owner wanted a larger waterline than standard size……could that be accepted? |
A: Water services will be appropriate for the application. Special needs of the land owner will be considered during construction. |
 Q21: Does the main water line have to be one continuous line and how will waterline be installed on dead end roads that come off of main road? Doesn’t there have to be a continuous loop or blow out hydrants at end of separate lines? |
A: Spur (dead end) lines will have a blow-off or a fire hydrant for periodic flushing. |
 Q22: What kind of chemical treatment, chlorination, filters, fluoride will be in used? Where is the water treatment plant? |
A: At a minimum, the water will be chlorinated. Fluoride is not being considered at this time. The groundwater will be treated at the Town of Richland’s Schoeller well site east of the hamlet of Richland. |
 Q23: Has the town looked into grants to help subsidize the cost? |
A: The Town has received notice that the project qualifies for a 30-year loan at 1% interest. No other grants are anticipated at this time, but if a feasible opportunity arises the Town will look into it. |
 Q24: I noticed the plan calls for service on Rainbow Shores Road, but not up North or South Rainbow Shores Roads. Is that because of the survey results in terms of interest by residents or is the road not wide enough? |
A: North Rainbow Shores survey results indicated 17 opposed, 9 in favor. I do not have the survey results for South Rainbow Shores Road. The roads are wide enough to install water main. |
 Q25: Will water ever be available to those residents or is this a one-time project? |
A: These areas could be served by a future project should the people need/want it. |
 Q26: I understand each resident will be responsible for the costs of their hook-up. In terms of the cost of the overall project , is that being assessed to the eventual users or are all taxpayers in the township paying for the project through the regular town taxes? I guess I'm curious as to whether I am going to pay for something I can't use. I assume not, but I thought I should ask. |
A: Only those parcels in the water district would assess a benefit charge. Charges would not be assessed to the town-wide general fund. |
 Q27: What regulations will there be for the water line from the main line into residences? (minimum pipe size, mandatory pipe material, etc.) |
A: The Town of Sandy Creek will adopt a local law and minimum standards. We expect the law and standards to be similar to Richland’s. Should this be the case, acceptable materials include 3/4-inch or larger type K copper or DR 11 4710 HDPE plastic pipe (currently stocked at Deaton’s). |
 Q28: If you have more than one building on a piece of property, will you be able to run both from one meter? |
A: Generally, one parcel, one meter. Owner would serve both from the same meter. |
 Q29: What happens if we do not get easements from all property owners on private roads? Does majority rule? |
A: Based on our experience with similar lake front water projects with many private roads, 99+% of the easements are obtained voluntarily. The Town would use their power of eminent domain to obtain any necessary outstanding easements. |
 Q30: Does everyone need to purchase a meter pit? |
A: No, meter pits are required only if you can’t protect the meter from freezing (i.e., seasonal camp). |
 Q31: Does the meter need to be inside a building? |
A: The meter needs to be installed in an accessible and freeze protected location in a building (e.g., basement or utility room) or in a specially designed below-grade meter pit located near the road. |
 Q32: What will this do to their tax assessment? |
A: Real property assessments are based on past sales data of “comparable” property. Should houses sell at higher prices because they have public water, then the assessments will eventually follow suit. I believe public water has a very minor impact on house sales and prices compared to the state of the economy and overall housing market. |